![]() |
| Home » Menu |
OrganizationIATMI AD Articles Special Events Careers Members Contact Us Profesional Profiles FAQ |
IATMI OMAN TECHNICAL TALK 1
General Thermal EOR Application
By : DR. Ardian Nengkoda Tanggal : 14 February 2008, pukul 11-12 siang.
IATMI OMAN TECHNICAL TALK 2PembicaraSimulation Study of An Oil Rim Reservoir
By : Tono Soeriawinata Tanggal : 26 March 2008,pukul 17:00 PM sampai selesai Field X Oil Rim Simulation Study Abstract Zone C in X Field is a giant gas reservoir with a relatively thin oil rim. The original/initial full field reservoir simulation model was built mainly to manage the gas cap zone. Due to mismatch with historical observed data in oil rim producers, this model is not suitable to be used for reservoir management purpose of oil rim. Therefore a work program has been prepared to improve the model for oil rim producers and to utilize it as reservoir management tool. The study includes the quality check of the original model in term of history matching quality, model structures and initialization; model update using new seismic structures and new well data; the history matching of the updated model; and finally the prediction/development scenarios based on the history match model.
IATMI OMAN TECHNICAL TALK 3PembicaraCompletion Strategy for an Optimum Production in SSM Field,Karim Cluster: A Case Study
By : Muhammad Mirza (Medco LLC Oman) Tanggal : 16 April 2008,pukul 17:00 PM sampai selesai Abstract SSM Field was discovered in 1985 and is producing from Al©\Khalata, Karim and the Haradh as the main producer. Most of the wells were drilled vertically and completed with 7 inch liner cemented and perforation job.An integrated study was conducted on 2006 ¨C 2007 with objective to improve the primary field recovery with infill drilling programs. 11 wells were drilled and completed in 2007 and 12 wells to be drilled in 2008.In April 2007, first new well was drilled and completed as the result of study, the initial production was lower than expected. Contrary with petrophysical analysis the well have reached the main target and should produce higher than actual. By reviewing the first well performance and method in achieving optimum production, the team found advance type of gun and cement evaluation as the best practical for completion strategy by using 4.5¡± casing gun.
Rekan2 IATMI, Dengan gembira kami kabarkan bahwa IATMI technical talk akan kita mulai. Kami selaku pengurus IATMI mengundang rekan2 semua untuk hadir dan berpartisipasi dalam technical talk pertama ini.
Saat ini baru ada 2 pembicara yang terdaftar. Supaya berkelanjutan, kami juga sangat mengharapkan rekan2 semua mau ikut menjadi pembicara untuk membagi pengetahuan dan ajang latihan presentasi. Topik bisa bebas tidak harus terpaku pada dunia perminyakan, selagi bisa meningkatkan pengetahuan, soft skill atau apa saja.
Ditunggu kehadirannya Mukmin. |
